EE(Planning)Water-II The rates of following non-schedule items on water side converted/updated based on CPWD-DSR-2021 are circulated for adoption in the department (DJB) to provide uniform basis for prepareation of esimates estimates.This is in continuation to Circular No.DJB/EE(PLG)W-II/RAs/2022/138 dt. 04.04.2022 - Legalspace